The Challenge
A corporate campus on the Highway 404 corridor had six main entrances with no automatic operators and a growing list of accessibility requests from staff.
Scope
- 6 swing operators across 2 buildings
- Frame reinforcement at 2 openings
- Wave-to-open sensors and push plates
- Every operator tested before sign-off
Our Approach
The crew walked every opening and checked header depth and door weight, then sent a written CAD scope with Dorma and Besam options inside two business days.
Two frames needed reinforcement before operators could be mounted. That work went into the spec so it was approved up front, not discovered mid-install.
Outcome
Installs ran over three weekends so the lobbies stayed open, and every operator was tested before sign-off.
"We had six main entrances across two buildings on our Highway 404 campus with no automatic operators and a growing list of accessibility requests from staff. The crew walked every opening, checked header depth and door weight, and sent a written CAD scope with Dorma and Besam options inside two business days. They flagged two frames that needed reinforcement before the operators went in, which nobody else had caught. Install ran over three weekends so the lobbies stayed open, and every operator was tested before sign-off."