Fire-Rated Door Installation
$2,500-$7,000Labelled 60 and 90-minute door, frame and hardware assemblies for stairs, corridors and service rooms, documented for inspection.
Request fire door assessmentMedical and professional office buildings along Yonge and Highway 7 need barrier-free sliders and operators, and the area's condo stock generates NFPA 80 fire door deficiency work on stair and corridor doors.
By the Commercial Door Toronto Install Crew. Commercial installation focus. Repair work and residential installs referred to partner network.
Richmond Hill concentrates medical and professional offices along Yonge Street and Highway 7, with the Beaver Creek business park to the east and condo towers up the Yonge corridor. That mix produces two main jobs: barrier-free sliders at clinic entrances, and fire-rated stair and corridor doors to clear inspection orders.
Clinics near Mackenzie Richmond Hill Hospital see a steady stream of patients with walkers and wheelchairs, so we spec automatic sliders and operators with sensors set for slow traffic.
Around Langstaff and Highway 7, the coming subway extension is drawing new density. New buildings there need Division 8 packages documented from day one.
Every job runs the way all our commercial door installation across Toronto and the GTA does: a free site measure, then a written CAD spec with a price range per opening within 2 business days.
Recent installs in the area
What you see: The inspector leaves an order: stair and corridor doors that do not latch, closers removed, painted-over labels, and a deadline to fix all of it.
Why it happens here: The city has a deep stock of mid-rise and high-rise condos along Yonge Street, and more density is planned around the subway extension stations near Highway 7, so each building carries dozens of rated doors that age at once.
What we do: We replace or repair each rated assembly through our fire-rated door installation service and hand over a label and photo record the inspector can close the order against.
Frame depth, hardware prep or rating gets checked after parts arrive, and the price moves. We measure first and put every opening in a written CAD spec before anything is ordered.
Non-rated hardware on a rated door, push buttons inside the swing, closers set too hard. Each one is a work order with a deadline. Our specs follow NFPA 80, OBC Part 3 and the AODA.
A half-finished swap leaves a building open. Our crews schedule around tenants and shifts and close every opening before they leave site.
A strike that misses the frame prep or an exit device on a stile too narrow to hold it. We list the hardware set per opening, so it fits the first time.
These are the scopes local clients book most often. Every price is a range; a technician confirms specs and price at your free on-site measure.
Labelled 60 and 90-minute door, frame and hardware assemblies for stairs, corridors and service rooms, documented for inspection.
Request fire door assessmentSingle and bi-parting automatic sliders with breakout egress panels for high-traffic retail, grocery and medical entrances.
Request slider site visitHandles, locks, electric strikes and mag-locks installed to a hardware schedule, most brands sourced within 7 business days.
Request hardware scheduleLow-energy and full-energy swing operators for lobbies, bank branches, clinics and retail entrances, with actuators and sensors.
See operator optionsTell us about the building, the openings and your timing.
We measure every opening and check frames, hardware and ratings ($0 first visit).
Spec and price range per opening within 2 business days. Nothing is ordered until you sign.
Install typically 7-14 business days from sign-off, tested, documented and warrantied.
No risk to start: the site measure is free, the spec is in writing within 2 business days, and nothing is ordered until you sign it. Every leaf carries a written warranty.
Drag any card to compare. Where we do not have four local installs on file yet, the nearest cities fill in.
Medical building bi-parting slider
Record bi-parting slider, medical building, Yonge and Hwy 7
Condo stair door order cleared
90-minute stair door, condo, Yonge and Major Mackenzie
Two-site hollow metal rollout
HM door + push bar rollout, distribution, Concord
Campus entrance operators
Swing operators, corporate campus, Hwy 404 corridor
"Horton slider went in over one night. Store opened on time."
"Record bi-parting slider at our medical building entrance. Breakout panels, sensors and threshold were all in the written spec, and the install matched it exactly."
"Our condo received a fire inspection order listing twelve stairwell and corridor doors with missing labels, failed closers and gaps outside tolerance. The team reviewed the order, checked each opening against NFPA 80, and sent a written scope separating doors that could be corrected from assemblies that had to be replaced. They installed new 90-minute labelled doors and frames on the stair shafts and new closers and latching hardware elsewhere. Every opening was documented with photos and label details for re-inspection, and the order was closed."
Representative client feedback; renter replaces with verified reviews at lease.
Yonge and Highway 7 and Mackenzie Health area: medical and professional office buildings with high-traffic entrances where automatic sliders and barrier-free operators are the norm.
Yonge and Major Mackenzie and Oak Ridges: condo buildings with stairwell and corridor fire doors, closers and latching hardware subject to regular fire inspections.
Beaver Creek business park and Leslie and 16th: office and flex buildings with suite hardware, access control and hollow metal service doors.
Sites are reached up Yonge Street, Highway 404 or Highway 407. Yonge and Highway 7 medical buildings are scheduled early morning or after clinic hours. Beaver Creek office work is often done on weekends.
Condo fire door work is scheduled with property management around resident access and the inspection order deadline.
Permits run through the city Building Services division, with fire inspections by the local fire service. Rated doors are installed and documented to NFPA 80 and CAN/ULC-S104, and medical entrances are spec'd to AODA and ANSI/BHMA A156.10.
When an inspection order lists door deficiencies, our scope separates doors that can be corrected from assemblies that must be replaced.
Fall is the busy season for condo fire door work ahead of winter inspections. Medical entrance sliders are set for winter hold-open times and can take heated thresholds to keep the track clear.
Postal codes we cover: L4B, L4C, L4S, L4E
Crews reach Yonge and Highway 7 via Highway 407, and Beaver Creek and Leslie via Highway 404.
Yes. A recent condo near Major Mackenzie had 12 fire doors on an order. We replaced or repaired each assembly and handed over label and photo records, and the order was closed.
Yes. Medical buildings at Yonge and Highway 7 get Record or Besam bi-parting sliders with sensors tuned for slow patient traffic, tested before handover.
Labelled assemblies usually run $2,500-$7,000 per opening depending on rating, frame, glazing and hardware. Multi-door inspection orders price lower per door.
The local fire service inspects, and permits go through the City of Richmond Hill Building Services division. Rated doors are installed to NFPA 80 with label photos.
Yes. We write one hardware set for every suite, so keys, levers and closers match and spares fit every door.
New construction near the planned subway stations at Highway 7 needs a full Division 8 submittal: frames, leaves, hardware sets and labels listed per opening before occupancy.
Still have a scope question? Our spec desk answers the phone.
(647) 503-6684Book a free site measure. You get a written CAD spec with a price range per opening within 2 business days.
Mon-Fri 8:00 AM - 6:00 PM. Emergency board-up after hours via the same line.
Request received
Thanks. Our spec desk will reply with a written CAD quote within 2 business days.
Request a Written CAD Quote
Free site measure ($0 first visit). Written spec and price range within 2 business days.