AODA Door Compliance Checker

Answer a few questions about an entrance to see which barrier-free items to check before an accessibility review.

Open checklist items

3

Review readiness score
20%
  • Public entrance without an operator: scope an AODA barrier-free operator.
  • Test opening force (OBC 3.8 limits differ for exterior and interior doors).
  • Check threshold height and winter hold-open settings on exterior entrances.

Guidance only, not a legal compliance opinion. Confirm requirements with your building official.

Book an AODA site check

We measure, test force and send a written CAD spec in 2 business days.

A quick screen for barrier-free entrances

Ontario's accessibility rules and the Ontario Building Code both shape how a public entrance should work. Many older commercial doors still depend on a heavy manual swing, which is a real barrier for customers with mobility devices, strollers or limited strength. This checker helps you screen an entrance in about a minute and see which items are worth reviewing before an accessibility audit or a renovation.

Select the door type, the occupancy and whether the entrance is exterior. Then answer two practical questions: are push-button actuators present on both sides, and has the opening force been tested in the last 12 months. The tool counts open checklist items and gives a review readiness score, with plain-language notes on what to check.

What the checklist looks at

The first item is the operator. A public-serving or institutional entrance with a manual swing door is the most common gap, and an AODA barrier-free automatic operator is usually the fix. The second is actuators. If a door has an operator, push buttons should be on both sides, outside the door swing, at an accessible height and with a clear approach.

The third is opening force. A door that is hard to open fails the people it is meant to serve, and the limits differ for exterior and interior doors, so it should be measured rather than guessed. The last is the exterior environment: threshold height, weatherstripping and winter hold-open settings matter in Toronto, where ice, wind and stack pressure can make a good door perform badly in January.

What this tool is not

This is guidance, not a legal compliance opinion. Requirements depend on your building, its construction date, the applicable code edition and the work being done, and your building official or an accessibility consultant makes the final call. A high readiness score means fewer obvious items are open, not that the entrance is certified.

Where the checker flags an operator or actuator gap, our team can scope it. We install AODA door operators, automatic swing and sliding systems, and the actuators and controls that go with them, and we are trained on NFPA 80 so fire-rated openings keep their labels.

Next steps after the checklist

Use the list to brief your property manager, then book a free site measure. We test the opening force, check clearances and send a written CAD spec within 2 business days, with a price range before any part is ordered. If the entrance is also fire-rated, we plan the operator so the rating and the barrier-free function work together.

More tools: see all free door tools.

AODA Door Compliance Checker: FAQ

Does a manual door fail AODA requirements?

Not automatically. Requirements depend on the building, its use and the work being done. Public-serving entrances with heavy manual doors are the most common concern, and an automatic operator is the usual solution. Confirm specifics with your building official.

How do I test door opening force?

Opening force is measured with a calibrated force gauge at the latch side of the door. We include force testing at the site measure, and re-test after any closer or operator adjustment.

Can you retrofit an operator onto an existing door?

Often yes, provided the door, frame and swing clearance can support it. Knockdown frames may need head reinforcement. We confirm this at the measure and state it in the written CAD spec.

Still have a scope question? Our spec desk answers the phone.

(647) 503-6684
Written CAD spec within 2 business days. Site measure $0 first visit.

Get a Written CAD Spec Before a Single Part Is Ordered

Free site measure ($0 first visit). Written spec and price range within 2 business days. Install typically 7-14 business days from sign-off.

  • No verbal estimates
  • Written warranty on every leaf
  • WSIB + fully insured

Mon-Fri 8:00 AM - 6:00 PM. Emergency board-up after hours via the same line.

(647) 503-6684 Get CAD Quote