# Retail Podium Storefront Bays, Queen West | Commercial Door Toronto

> Queen West new-build retail podium: 3 Kawneer storefront bays with entrances from one trade. Inspections passed first time, on-date tenant turnover.

URL: https://commercialdoortoronto.ca/projects/retail-podium-storefront-queen-west/

Queen West, Toronto retail $30,000-$38,000

# Retail Podium Storefront Bays, Queen West

3 Kawneer storefront bays with entrances. First-time inspection pass, on-date tenant turnover.

![Retail Podium Storefront Bays, Queen West before in Queen West Toronto install](https://placehold.co/1280x720/475569/ffffff?text=Before+rough+storefront+openings+behind+hoarding+on+Queen+West+retail+podium+construction)

![Retail Podium Storefront Bays, Queen West after in Queen West Toronto install](https://placehold.co/1280x720/2563EB/ffffff?text=After+three+finished+Kawneer+aluminum+storefront+bays+with+glass+entrances+on+Queen+West)

Before After 

Kawneer Trifab framing, 1-inch sealed IGU, aluminum entrances | Fabrication lead time, then 3 days per bay on site | $30,000-$38,000

## The Challenge

A retail developer on Queen West had three storefront bays to deliver on a fixed tenant turnover date, and did not want framing, glazing and doors split across trades.

### Scope

-   Kawneer storefront framing, clear anodized
-   Sealed IGU and safety glazing at doors and sidelites
-   Aluminum entrance doors with closers and deadlocks
-   Anchor and threshold details in the CAD spec

## Our Approach

We took the framing, glazing and entrances as one package. The written scope listed glass makeup, anchor spacing and threshold detail before anything was ordered.

Bays were installed one at a time behind hoarding, with sealing and threshold details checked before glazing.

![Glazing crew setting an insulated glass unit into an aluminum storefront frame](https://placehold.co/1200x800/12151A/f8fafc?text=Glazing+crew+setting+insulated+glass+unit+into+aluminum+storefront+frame+on+Queen+West)

### Outcome

Inspections passed the first time and the bays were ready for tenant turnover on the agreed date.

> "New-build retail podium on Queen West with three storefront bays. They handled the Kawneer framing, glazing and entrance doors as one package, so we had a single trade responsible for the whole opening. The written scope listed glass makeup, anchor spacing and threshold detail before anything was ordered. Inspections passed the first time, and the bays were ready for tenant turnover on the agreed date."

More Projects

## Other Recent Projects

King West, Toronto Bank Branch Operator Retrofit, King West CAD scope day 3, install closed day 18, no callbacks

[/projects/bank-branch-operator-retrofit-king-west/ →](/projects/bank-branch-operator-retrofit-king-west/)

 

Yonge and Sheppard, North York Aluminum Entrance + AODA Operator, North York Push-force passed first walkthrough, inspector signed on site

[/projects/aluminum-entrance-aoda-north-york/ →](/projects/aluminum-entrance-aoda-north-york/)

 

Concord, Vaughan Two-Site Hollow Metal Rollout, Vaughan One invoice, written warranty on every leaf

[/projects/two-site-warehouse-rollout-vaughan/ →](/projects/two-site-warehouse-rollout-vaughan/)

![](https://placehold.co/1920x900/12151A/f8fafc?text=Commercial+door+crew+of+two+installing+aluminum+entrance+doors+at+dusk+on+a+Toronto+office+building+lobby)

Written CAD spec within 2 business days. Site measure $0 first visit.

## Get a Written CAD Spec Before Anything Is Ordered

Free site measure ($0 first visit). Written spec and price range within 2 business days. Install typically 7-14 business days from sign-off.

-   No verbal estimates
-   Written warranty on every leaf
-   WSIB + fully insured

Request Written Quote

[/contact/#capture-form →](/contact/#capture-form)

 

Call (647) 503-6684

[tel:+16475036684 →](tel:+16475036684)

Mon-Fri 8:00 AM - 6:00 PM. Emergency board-up after hours via the same line.
