# Division 8 Door Package, Liberty Village | Commercial Door Toronto

> Liberty Village 3-storey office build: Division 8 door package with 22 leaves, hollow metal frames and 2 rated stair doors. Zero door deficiencies at occupancy.

URL: https://commercialdoortoronto.ca/projects/office-build-division-8-liberty-village/

Liberty Village, Toronto office $24,000-$30,000

# Division 8 Door Package, Liberty Village

22 leaves, hollow metal frames, 2 rated stair doors. Zero door deficiencies at occupancy.

![Division 8 Door Package, Liberty Village before in Liberty Village Toronto install](https://placehold.co/1280x720/475569/ffffff?text=Before+unfinished+office+corridor+with+bare+steel+stud+door+openings+in+Liberty+Village+build)

![Division 8 Door Package, Liberty Village after in Liberty Village Toronto install](https://placehold.co/1280x720/2563EB/ffffff?text=After+finished+office+corridor+with+hollow+metal+frames+and+suite+doors+in+Liberty+Village)

Before After 

Hollow metal frames, Grade 1 hardware sets, labelled stair assemblies | Frames set before boarding, doors hung at finish stage | $24,000-$30,000

## The Challenge

A general contractor on a three-storey Liberty Village office build needed a single trade to own the Division 8 door package, including two rated stair doors, without slowing the drywall schedule.

### Scope

-   22 door leaves, hollow metal frames
-   2 labelled stair door assemblies with rated closers
-   Hardware sets keyed to the building plan
-   Close-out binder with labels, keying and warranty

## Our Approach

We reviewed the architect hardware schedule against the drawings and flagged two handing conflicts and one undercut issue before submittals. The CAD submittal listed every frame, leaf, hardware set and label.

Frames were set and anchored before boarding so the drywall trade never waited. Doors and hardware went in at finish stage, and rated openings were checked for gaps and latching.

![Installer anchoring a hollow metal frame in a steel stud wall before drywall](https://placehold.co/1200x800/12151A/f8fafc?text=Installer+anchoring+hollow+metal+frame+in+steel+stud+wall+before+drywall+in+Liberty+Village+office)

### Outcome

The door scope closed with zero deficiencies at occupancy. The GC reported the CAD submittal matched the architect spec and the frames never held up another trade.

> "We brought them in for the Division 8 package on a three-storey office build in Liberty Village: hollow metal frames, 22 door leaves, hardware sets and two rated stair doors. The CAD submittal was clean, the hardware schedule matched the architect's spec, and their crew coordinated with our drywall trade so frames were set before boarding. Zero deficiencies on the door scope at occupancy."

More Projects

## Other Recent Projects

King West, Toronto Bank Branch Operator Retrofit, King West CAD scope day 3, install closed day 18, no callbacks

[/projects/bank-branch-operator-retrofit-king-west/ →](/projects/bank-branch-operator-retrofit-king-west/)

 

Yonge and Sheppard, North York Aluminum Entrance + AODA Operator, North York Push-force passed first walkthrough, inspector signed on site

[/projects/aluminum-entrance-aoda-north-york/ →](/projects/aluminum-entrance-aoda-north-york/)

 

Concord, Vaughan Two-Site Hollow Metal Rollout, Vaughan One invoice, written warranty on every leaf

[/projects/two-site-warehouse-rollout-vaughan/ →](/projects/two-site-warehouse-rollout-vaughan/)

![](https://placehold.co/1920x900/12151A/f8fafc?text=Commercial+door+crew+of+two+installing+aluminum+entrance+doors+at+dusk+on+a+Toronto+office+building+lobby)

Written CAD spec within 2 business days. Site measure $0 first visit.

## Get a Written CAD Spec Before Anything Is Ordered

Free site measure ($0 first visit). Written spec and price range within 2 business days. Install typically 7-14 business days from sign-off.

-   No verbal estimates
-   Written warranty on every leaf
-   WSIB + fully insured

Request Written Quote

[/contact/#capture-form →](/contact/#capture-form)

 

Call (647) 503-6684

[tel:+16475036684 →](tel:+16475036684)

Mon-Fri 8:00 AM - 6:00 PM. Emergency board-up after hours via the same line.
